Machine Service and Maintenance
Winterizing your Mixmate
Winterizing the Mixmate follows the same simple rules as winterizing anything else with plumbing: 1. Open all the low points and let everything drain to those places. 2. Cycle valves multiple times to make sure everything is out of them. Ball Valves ...
Jug Rinse Sensor Replacement
Load Cell Connector Replacement
Proximity Sensor Connector Wiring
Fusion Rinse Sensor: Blue - Pin#5 - Ground Brown - Pin#6 - 12 V+ Black - Pin#8 - Signal _________________________________ Pro Rinse Sensor: Blue - Pin#4 - Ground Brown - Pin#7 - 12 V+ Black - Pin#9 - Signal Pro Lid Sensor: Blue - Pin#5 - Ground Brown ...
Gear meter repair
Before opening a gear meter please note that the cover needs to be remove carefully as it is possible to break the gear axels if the cover is removed incorrectly. A broken axel can not be replaced and a new meter will be required. When replacing ...
Load cell connector wiring
FLINTEC Load Cell wire colors: +Excitation (Green) +Signal (White) -Excitation (Black) -Signal (Red) Shield/Ground (Yellow) Other manufacturers may be different colors. If not known at all, use a Digital Multimeter and find the 2 that have the most ...