Data Entry
What are Conditional Rates? How do I create them?
What are Conditional Rates? Conditional rates are the ability to predefine an adjustment range at the time of Mixing to a product on a work order. A condition can be pretty much anything you can quatify with a numeric value. How are Conditional Rates ...
What is the “destination” in a Work Order?
The destination assigned in a Work Order is the container to which the Mix is intended to go into. If you are filling many of the same size containers, this would be a good opportunity to name this something generic like "3200 gallon Tank" where the ...
How do report tags work? When/where/why to add them to the work order vs selecting them at the end of each mix?
Report tags are User Defined filters added to Work Orders and Mixes to be able to filter the records at a later time. Go to Report Tags for how to enter your information. Typical Report Tags are as follows: For Crops: Corn, Soybeans, Wheat, etc. For ...
I want to record weather conditions with every mix, how do I accomplish this?
Conditions are User Entered and Defined. You create all the conditions you would like to record. Pay attention to "Apply to Every Mix" as this will make the condition be recorded with every mix. The tutorial for this can be found at Conditions.
What happens when you assign a Mixmate to a Work Order?
When you assign a Mixmate to a work order, this filters the Work Order selection on the Mix tab by which Mixmate is selected in the top selection. If you want to have all work orders available to all your Mixmates, leave this blank.
How can I change my units of measurement from standard/imperial to metric and vice versa?
This setting is found in your Group Settings. To edit this, do the following: Admin Tab -> My Groups -> "Your Group" -> Group Settings -> Select desired Default Unit of Measure Sytem -> Save in upper right corner You can also set the following: ...
Is there a way to make single product work order in the app?
There are 2 different ways to make single product work orders. This is typically used when wanting to do loads of fertilizer, etc. Here is the link to the Work Orders tutorial: Click Here Method 1 (Use Totals) : Data Tab -> Work Orders -> Blue "+" in ...
Can I add my own custom rates?
Yes you can create any custom rate. Here is a link to rates: Click Here
How do I change the units of measure for products in a blend?
Changing the units of measure for products in a given blend must be done at the product level. If you are about to start a blend and notice the units of measure needs to change, please do directly to that product under Products and make the change. ...
Can I change the mix order of my products?
Currently, the way the system functions is to introduce products into the mix in the order they are listed in the Work Order. Here is a video of how to change the mix order inside the Work Order. Data -> Work Orders -> Open the Work Order that you ...